Planning & Controlling Using Primavera P6
Lessons:
103 Lesson
Duration:
20 Hours
Total Student:
2367 Enrolled
By HA Management
In Planning
- February 1, 2026
- English
Benefits of the course
- .
Course Content
-
تنزيل برنامج البريمافيرا
-
شرح طريقة تسطيب البريمافيرا
-
Add Activity & Duration
28:30 -
Relations
35:50 -
Calender
36:39 -
Activity Types in Primavera
15:00 -
Session 02 Data – PDF
-
Resources
45:56 -
Resource Assignments
16:08 -
Activity Usage Spreadsheet & Profile
09:35 -
Resource Usage Spreadsheet & Profile
18:48 -
Resource Curve
04:13 -
Duration Types in Primavera
08:00 -
Session 03 Data – PDF
-
Activity Codes
07:51 -
Filter & Group And Sort
25:08 -
User Fields
06:22 -
Global Change
08:35 -
Cost Account
19:18 -
Driving & Non Driving
03:06 -
Activity Steps
03:08 -
Layout
00:00 -
Session 04 Data – PDF
-
View Log
12:12 -
Update Time
17:23 -
Update Cost
05:32 -
Earned Value
23:29 -
Import & Export & Printing
28:13 -
Session 05 Data – PDF
-
What are the Project Documents Which You Need to Create Baseline Schedule?
33:51 -
Study Project Layout
09:04 -
Extract Data From Contract
10:55 -
BOQ & How to Create Scope of Work Template
27:42 -
Create Professional WBS (Engineering – Procurement – Construction)
19:00 -
What is the WBS and How to Create?
18:03 -
Create WBS Using Notepad
30:00 -
شرح عمل التاسك – الخاص بالجزء الثانى
05:00 -
Session 06 Data – PDF & Excel
-
What is the Master Format (CSI Code)
11:43 -
Create Activity List Based On CSI Code
09:16 -
WBS Code & Activity ID
26:37 -
Create Activity Dictionary
06:21 -
Create Resource Dictionary
24:27 -
How to Measure the Progress
29:28 -
Actual Productivity Rate Calculation – ازاى تحسب الانتاجيات الفعلية لمشروعك
10:00 -
Session 07 Data – PDF & Excel
-
Mapping Sheet ( Cash Loading Sheet)
07:03 -
Type Of Link Between Boq Items & Activities
06:10 -
Activities Weights
07:03 -
How To Create Mapping Sheet
80:00 -
Session 08 Data – PDF & Excel
-
Relation Between Activities
60:00 -
Relation Between Engineering & Procurement & Construction
08:57 -
Engineering Leveling
10:22 -
How to Create S-Curve & Manpower Histogram
34:01 -
S-Curve Early & Late
03:00 -
S-Curve Vs Cash Flow
14:54 -
How To Review Baseline Schedule (DCMA 14)
46:38 -
ازاى نحمل الموارد بطريقة ريسورس الكاش – Cash Resource
09:00 -
لو عايز احمل ريسورسز على البرنامج كله فى دقيقة واحدة – Resources by Duration
06:00 -
Procurement Plan – عمل خطة الاحتياجات للخامات و المقاولين
27:12 -
Session 09 Data – PDF & Excel
-
What Is The Difference Between % Complete
10:34 -
Update By Excel Sheet (Duration and Physical Methods)
85:14 -
How to read Update Schedule – ازاى تقرا الابديت و تحلله ؟
13:46 -
Dates Type in Primavera
03:31 -
What is the Difference Between Retained Logic & Progress Override
11:57 -
Schedule Comparison – ازاى تقارن بين اتنين جدول زمنى
09:00 -
Project Logs – ازاى تحصل على الابديت من كافة الادارات بالشركة
35:36 -
Daily Report
10:37 -
Weekly, Monthly And Narritave Report
54:38 -
Earned Schedule VS Earned Value
15:00 -
Session 10 Data – PDF & Excel
-
Frist Meeting with Consultant – أول اجتماع مع الاستشارى كمهندس بلاننج
28:00
-
Baseline Evaluation System – ازاى تعمل نظام تقييم للجدول الزمنى
32:00
-
Solve Out of Sequences by Excel – Part 01
14:00 -
Solve Out of Sequence by Excel – Part 02
17:00
-
Revised & Recovery – Part 01
03:00 -
Revised & Recovery – Part 02
21:00 -
Revised & Recovery Steps – Part 03
35:00
-
Interview for Planning Engineers
51:00 -
سؤال مهم فى الانترفيو و الاجابة عليه
08:49
-
Activities Ladder
06:00 -
Dangling Activity
15:19 -
Level of Effort Activities
06:38 -
How to Export & Import Database – ازاى تعمل انبورت و اكسبورت لل Database
04:00 -
Lag Report – ازاى تعمل تقرير كامل لكل الانشطة الى فيها Lag
03:00 -
ازاى تعمل اس كيرف بدون جدول زمنى – How to create S Curve Without Schedule
50:00 -
Float Paths – ازاى تطلع كل الكريتكال باث تحت بعض لمعالجتهم
02:00 -
How to Import with no problem – أزاى تعمل انبورت لبرنامج جديد بدون مشاكل الموارد و الكاليندر
05:00 -
How to create New Database – ازاى تعمل داتا بايز جديدة
03:06 -
ازاى تفتح البريامفيرا لو من نسخة اعلي من نسختك على جهازك
02:30 -
Copy from Poject to another – ازاى تنقل انشطة و علاقات من مشروع لمشروع تانى
04:30 -
ازاى تحل مشكلة اللغة العربية فى البريمافيرا
06:00 -
How to Remove Update – ازاى تشيل الابديت من البرنامج
10:00
-
Discuss Session
01:46:28
Instructor
CEO & Co-founder HA Management
PhD,MSC,PMP,RMP
Doctor and Lecturer in Project Mangement
PhD,MSC,PMP,RMP
Doctor and Lecturer in Project Mangement
Planning & Controlling Using Primavera P6
- Lessons103 Lessons
- Duration20 hours
- CertificationYes
Related Course
- 86 Lessons
- 2519 Students
Cost Control Workshop – Level 01
- 25 Lessons
- 722 Students
Cost Control Workshop – Level 02
- 112 Lessons
- 551 Students
PMP Workshop
Hi, Welcome back!